- DRT Homepage
- > Quality & Sustainable Development
- > QHSE & Environmental Protection
QHSE & Environmental Protection
Protecting people, property and the environment is a priority objective.
- Since 1990 signatory to the ‘‘Responsible Care’’ international charter for environmental protection,
- Deployment of an Integrated HSQE System on each of the industrial sites.
A permanent commitment and actions for continuous improvement including:
Environment
- 1989: Physical and chemical waste treatment plant
- 1993: New co-product boiler (distillation residue) and electro-filter for combustion fumes
- 1996: Incinerator fume treatment
- 1997: Biological waste treatment plant
- 1997: Internal waste collection centre
- 2001: Modification of the vacuum system for tall oil distillation
- 2002: Prevention of the risk of ‘‘legionella’’ in cooling towers
- 2004: Treatment of solvent gaseous effluent
- 2007: Additional treatment of incinerator fumes
Safety
- Major Accident Prevention Policy for the 3 SEVESO high level sites
- Safety assessments for all manufacturing processes
- Continuous improvement of the Safety Management System
- Prevention and protection equipments against risks of explosion, fire, toxic leakages and land pollution
- Periodic exercises and training with on site firemen.
- Assessment and reduction of occupational risks
- Prevention of risks linked to the exposure of workers to hazardous chemicals



